Confirmed List · Residential · Orchard

Orchard Boulevard

Awarded Awarded

  • 0.34 hasite area
  • 2.8plot ratio
  • 110homes (est.)
  • 99 yrslease
  • S$181.9Mtender price
  • S$1,755land rate psf ppr
  • S$3,410est. launch price psf* (3,070–3,740)
Aerial illustration of Orchard Boulevard: the site in gold among the buildings, roads and trees around it
BLD illustration rendered in Blender: the site in gold among the surrounding buildings, roads and trees modelled from OpenStreetMap (© OpenStreetMap contributors); the gold area is the published site outline. Heights, colours and trees are illustrative, not to scale and not a survey.

The site in 3D

The plot drawn to scale from its official outline. The stacked layers show the plot ratio: 2.8 times the site area may be built as floor space, so each layer is one “site area” of floors. It is not the design of the future building.

Other sites on the programme within 1.6 km are drawn around it.

Loading the 3D view… (it needs WebGL).

Details

List
Confirmed List · 2H2026 (CL)
Status
Awarded
Use
Residential
Site area
3,438 m² · 0.34 ha
Plot ratio (GPR)
2.8
Maximum floor area
9,627 m² · 103,624 sq ft
Homes (estimated)
110
Lease
99 years
Sale by
Tender
Launched
13 Aug 2026
Tender closes
29 Oct 2026
Awarded
4 Nov 2026
Bids
5
Successful tenderer
Intrepid Investments Pte. Ltd. and TID Residential Pte. Ltd.
Tender price
S$181,861,924.00
Land rate
S$1,755 psf ppr
Lowest bid
S$139.9M
Planning area
Orchard · CCR
Nearest MRT
Orchard Boulevard
Expected completion
2031
Estimated launch price*
S$3,070 – S$3,740 psf

Conditions and notes

New site introduced in 2H2026.

Estimated launch price*

From the land rate Intrepid Investments Pte. Ltd. and TID Residential Pte. Ltd. paid (S$1,755 psf ppr), the homes here would likely need to launch at about S$3,070 – S$3,740 psf — around S$3,410 psf in the middle — for the developer to cover its costs and make a usual margin.

Per sq ft of floor areaLowHigh
Land (tender price ÷ maximum floor area)S$1,755S$1,755
Construction and professional fees (Core Central Region)S$850S$1,050
Interest, stamp duty on the land, marketing, contingenciesS$190S$310
BreakevenS$2,800S$3,120
Developer’s margin (10% – 20%)+10%+20%
Estimated launch price*S$3,070S$3,740

* An estimate by Ben Lim District from the land rate and typical development costs and margins, not a price from the developer. Actual launch prices depend on the design, unit sizes, the market at launch, and the developer’s own costs and pricing; the floor area used excludes any bonus space (such as balconies), which can lower the price per sq ft. For general information only, not advice.

Nearest other sites on the programme

‹ All GLS sites in 3D

Source: Official public data. Data & licences As published on 23 November 2026; checked daily.