Paper 1 · Unit 2.13
Planning and Development of Land for the RES Exam
Unit 2.13 covers the public law of land use: what counts as development, who decides whether it may go ahead, and what the Master Plan does. Most exam questions reduce to one of two things — identifying that a proposal needs URA's permission, or identifying which agency is responsible for what.
Last reviewed November 19, 2026
The Planning Act and what counts as development
The governing statute is the Planning Act 1998. Section 3 defines development as the carrying out of any building, engineering, mining, earthworks or other operations in, on, over or under land, or the making of any material change in the use of any building or land. The second limb is the one candidates overlook: a change of use is development and needs permission even where no building works at all are carried out. Subdivision is dealt with separately by section 4 and needs its own permission.
Section 5 provides that the Minister appoints the competent authority, whose functions may be performed by officers it authorises. In practice the Urban Redevelopment Authority is the competent authority for planning permission and the national planning and conservation authority. Carrying out development without the requisite planning permission is a breach of planning control. Freehold tenure gives no exemption: planning control applies to all land whatever the tenure.
It helps to keep the agencies apart, because questions are often built around that. URA grants planning permission and prepares the Master Plan. BCA regulates building works and issues the Temporary Occupation Permit and Certificate of Statutory Completion. SLA manages State land, maintains the land register and administers the Land Betterment Charge. IRAS assesses annual value and collects stamp duties. MAS sets lending rules such as loan-to-value limits and the TDSR.
The Master Plan and the Long-Term Plan
The Master Plan is Singapore's statutory land use plan. URA describes it as guiding development over the next 10 to 15 years, setting the permissible land use and density for developments, and translating the broad strategies of the Long-Term Plan into detailed plans for land and property development. The Long-Term Plan is the strategic plan with a 40 to 50 year horizon, previously known as the Concept Plan; it does not set controls for individual parcels.
The Master Plan is reviewed every five years. The current plan is Master Plan 2025, gazetted on 1 December 2025, which superseded Master Plan 2019 (as at October 2026). Between reviews it is kept current by gazetted amendments, published by URA first as proposed and then as approved amendments.
Density is expressed as gross plot ratio, which is gross floor area divided by site area. Rearranged, maximum GFA equals site area multiplied by GPR — so a 2,000 sqm site with a GPR of 2.8 allows 5,600 sqm of GFA. Dividing instead of multiplying is the standard wrong answer. Gross floor area is the total area of covered floor space including the half thickness of external walls but excluding voids, which is why filling in an airwell open to the sky creates new GFA.
The Master Plan shows what may be permitted; it is not itself an approval. Zoning that allows a use does not mean the use is approved, and it does not override a restriction in the State title, which is a matter for SLA's consent.
Written permission: planning, conservation and subdivision permission
Section 12 of the Planning Act is the provision under which the competent authority grants the three kinds of permission the syllabus names: planning permission for development, conservation permission for works in a conservation area, and subdivision permission for subdividing land. Collectively these are the written permissions.
For a development application, URA may grant Provisional Permission first and then Written Permission. A Provisional Permission lapses 6 months from the day it was granted; a Written Permission lapses 2 years after the grant date. An extension must be applied for at least two months before expiry, and for approved developments where construction has not started on sites unaffected by public schemes or planning studies, up to two extensions may be granted, potentially six years in total from the date of grant. The fee is $500 for the first and second extension and an incremental $1,000 for the third and subsequent ones, with processing generally about 15 working days (URA, as at October 2026).
Applications are submitted by the owner, normally through a qualified person such as an architect, not by a salesperson. Where the applicant does not own the land, the owner's written consent is needed — or SLA's, where the land belongs to the State.
Change of use
Every property has an approved use, and using it for anything else is development requiring URA's planning permission, even with no building works and even where the Master Plan zoning would allow the new use. Converting a shop to a food and beverage outlet, an office to a commercial school, or a shop unit to a tuition centre are all material changes of use.
The application is made through GoBusiness. URA states a non-refundable fee of $500 and usual processing of about 10 working days, notes that a Land Betterment Charge may be payable where the permission increases the land value, and advises owners not to commit to a tenancy before approval is obtained, because the use may be refused (URA, as at October 2026). Registering a business with ACRA is not planning permission, and neither a management corporation nor a Town Council can grant it. For premises owned by HDB, HDB approves uses within its properties.
Two separate controls often arrive together. A State lease will normally restrict the land to the use stated in the title and will contain a right of re-entry for breach, so a change may also need SLA's consent to lift or vary that restriction — a chargeable consent on which the Land Betterment Charge, which replaced the Development Charge and Differential Premium on 1 August 2022, may be assessed. Other agencies may have their own requirements, and a private restrictive covenant is unaffected by planning permission: those entitled to its benefit can still enforce it.
Conservation
URA is the national conservation authority. The Minister may designate an area, a single building or a group of buildings as a conservation area where it has special architectural, historic, traditional or aesthetic interest, and URA issues conservation guidelines for buildings and land within those areas. The conservation areas include the Historic Districts of Boat Quay, Chinatown, Kampong Glam and Little India; the Residential Historic Districts of Blair Plain, Cairnhill and Emerald Hill; Secondary Settlements such as Balestier, Geylang, Joo Chiat and Tiong Bahru; and individually conserved bungalows.
Conservation permission is required before any restoration, addition, alteration or new use of a conserved building. URA assesses the works against its "3R" principle: Maximum Retention, Sensitive Restoration, Careful Repair. Three misconceptions are regularly tested. Conservation controls are not limited to the façade; they reach the roof, structure and internal elements. Conservation status adds requirements rather than replacing them, so a change of use in a conserved shophouse needs planning permission as well as conservation permission. And BCA's approval of building works, or a management corporation's consent, cannot substitute for URA's.
Enforcement and the limits of planning control
Where it appears that a breach of planning control has occurred, the competent authority may serve an enforcement notice under section 28 of the Planning Act. Unauthorised development and unauthorised change of use are offences, and URA has stated in prosecution announcements that the Planning Act allows fines of up to $200,000 per charge. Enforcement against unauthorised works to conserved buildings has produced substantial penalties, including a $250,000 fine for unauthorised works to a conserved shophouse.
The Planning Act is also the basis for URA's control of short-term accommodation: a private home may not be let for less than three consecutive months, and URA enforces that minimum. Serviced apartments have a minimum stay of seven days.
Finally, planning permission does what it says and no more. It confirms that a proposal is acceptable under the Planning Act. It does not extinguish private rights such as easements and restrictive covenants, it does not vary the covenants in a State title, and it is not a way of regularising a breach after the event — and the Land Betterment Charge is a charge on the uplift created by a granted consent, not a fine that legitimises an unauthorised use.
Glossary
- Development
- Under the Planning Act, building, engineering, mining, earthworks or other operations on land, or any material change in the use of land or a building.
- Competent authority
- The authority appointed by the Minister under the Planning Act to administer planning control; in practice the Urban Redevelopment Authority.
- Master Plan
- The statutory land use plan setting permissible use and density, guiding development over 10 to 15 years and reviewed every five years.
- Written permission
- The permission granted under the Planning Act for development, works in a conservation area or subdivision.
- Gross plot ratio (GPR)
- Gross floor area divided by site area; the control that determines how much floor space a site may take.
- Gross floor area (GFA)
- The total covered floor space including the half thickness of external walls but excluding voids.
- Conservation permission
- URA's permission, required before any restoration, addition, alteration or new use of a conserved building.
- Land Betterment Charge
- The charge administered by SLA on the increase in land value arising from a chargeable consent, which replaced the Development Charge and Differential Premium on 1 August 2022.
Questions candidates ask
Does a change of use need planning permission if there are no building works?
Yes. Under section 3 of the Planning Act, making any material change in the use of land or a building is itself development, so URA's planning permission is required even where nothing is built or altered. Zoning that would allow the new use is not an approval, and other agencies may have their own requirements.
What is the difference between the Master Plan and the Long-Term Plan?
The Master Plan is the statutory land use plan that sets the permissible use and density for land, guiding development over the next 10 to 15 years, and it is reviewed every five years. The Long-Term Plan, previously the Concept Plan, is the strategic plan with a 40 to 50 year horizon; the Master Plan translates it into detailed plans.
How long does planning permission last?
URA states that a Provisional Permission lapses 6 months from the day it was granted and a Written Permission lapses 2 years from the date of grant. An extension must be applied for at least two months before expiry, with a fee of $500 for the first and second extension and an incremental $1,000 thereafter (as at October 2026).
Who grants permission to alter a conserved shophouse?
URA. Conservation permission is required before any restoration, addition, alteration or new use of a conserved building, and the works are assessed against URA's conservation guidelines and its 3R principle of Maximum Retention, Sensitive Restoration and Careful Repair. BCA's building works approval and an MCST's consent do not replace it.
Does URA approval override a restrictive covenant or a State title restriction?
No. Planning permission is public land use control and operates separately from private property rights, so neighbours with the benefit of a restrictive covenant may still enforce it. A restriction in a State title is varied only with SLA's consent, which may attract a Land Betterment Charge.
Test yourself
Try free questions on this part of the syllabus, or join the Academy for full timed mock papers with every answer explained.
Related guides
Based on official public data. Laws, rules and fees change: always check the current official position before you rely on a figure.